Actions from society:
* Oceanographic Society of Japan.海洋学会 | 日本農業気象学会
* May 20: Meteorological Society. 気象学会More-1, More-2.
* Japanese Society of Soil Science and Plant Nutrition. 日本土壌肥料学会.
* Aerosol Society: Articles on radioactive aerosol Journal of Aerosol Research, Japan (1994-2002)
| Fukushima, Disaster Information | 放射線対策 | 官邸 (twitter)
| 電力使用率 | 本日の電力需給量
| 環境防災ネット | 原子力工学者の意見 |
Relation between RAIN and others.
:: Radioactive material level of fallout in Tokyo / day > tokyo-eiken.go.jp
:: Radioactive material level in tap water in Tokyo / day > tokyo-eiken.go.jp
:: Environmental radiation levels in Tokyo / hour > tokyo-eiken.go.jp
MEMO
* Radioactive level of Tokyo : Average before 11 March ~ 0.034 μGy/h >> Graph
* 自然界で1年間に2400 micro Sv.(6.5 micro Sv/day = 0.27 micro Sv/h)
* Distance between Tokyo and Fukushima reactor = 250 km.
* Radiation Dose Chart (for Basic Education)
Video @ YouTube:
– 児玉龍彦 (U. Tokyo)…これは粒子です。粒子の拡散は非線形。。流体力学の計算でも最も難しい。。メルトダウンして放出するとなると細かい粒子が沢山放出される。今回の稲藁の問題です。
Journal: PNAS
海水注入で放射性硫黄が飛散=カリフォルニアで観測―米大学
[時事通信 8月16日]福島第1原発事故で、原子炉冷却に注入した海水から放射性硫黄が発生し、米カリフォルニア州まで飛散していたとする観測結果を、UCの研究チームが16日までにまとめた。同大のエアロゾルを観測する施設で3月28日、放射能を帯びた硫黄35を含む硫酸イオンの量が例年平均の約3倍検出された。硫黄35は自然界にも存在しているが、量はわずか。研究チームはシミュレーションなどから、今回検出された硫黄35は、コンクリートポンプ車などで原子炉に注入した海水に含まれる塩素が、中性子と反応して生じたとしている。
Around our Lab:
July 25-29, Aug.29,30 Sept.1,2 (total ten days): Our building (Graduate School of BASE) will experimentally “blackout” the electric power of all Labs.
June 20: Morning class/lecture will be started from 8:00 (changed from 8:45)
Mar. 28: JAAST changed the venue of Annual Meeting (August 2011), from Fuchu campus to Osaka Prefecture University. *Lenggoro: Organizing Committee.
Mar. 18: One of new members returned to Tokyo, after spending few weeks in home town, Fukushima city.
Mar. 16: Radioactive level our campus is 0.055 micro Sv/h. The averages before 11 March are 0.028-0.079 micro Sv/h.
Mar. 15: We’ve regrettably canceled 76th Annual Meeting, Society of Chemical Engineers, which should be held Mar. 22-24 in Koganei campus. (Lenggoro: Program committee)
Mar. 14: Tokyo Electric Power Company (Tepco) is making a On/Off (blackout) regulation for supplying campus: Three hours OFF per day (Not every day). This on/off condition continued for few days.
Mar 11: Japan’s biggest earthquake on record with a magnitude 9.0 (approximately same Richter magnitude scale). Distance from Epicenter to our campus is around 400 km. Our lab, students, related members/families are fine, physically.